Winter sand making machine maintenance guidelines to do these OK!
Sand making machine is one of the key equipment in sand making production. In the process of harsh environment operation in the long winter, it will produce large friction and gravity, so the wear and tear of the equipment is inevitable. In order to ensure the normal production and continuous and reliable operation of the sand making machine. It is necessary to do the winter maintenance of the sand making machine. Bearing and lubrication system are key parts of sand making machine equipment that need to be maintained in winter, which need to be paid attention to.
1. Bearing maintenance
In the crushing production, the bearing link of the sand machine is easy to be damaged because of greater wear and tear. So it must be carefully maintained in use, lubricated and refueled in time, increased the service life of the bearing. And the maintenance cost can also be saved.
2. Lubrication system maintenance
In the production, frequent attention and timely lubrication of the friction surface can ensure the normal operation of the sand making machine and the service life of the equipment can also be extended. Therefore, the maintenance and lubrication system should also be paid attention to. In order to stabilize the production of the sand maker under careful maintenance, it can be used for users
Create considerable profits, specific maintenance measures details:
The amount of grease added in the bearing seat should be 55-70% of the volume, adhere to 3 months to change once, oil change needs to clean the runway of the bearing roller.
The above is the maintenance of bearings and lubrication system parts. In addition, in daily production, it is necessary to maintain the sand maker regularly and properly handle and use it. Repair and maintenance work, do not use only or only repair without maintenance, do use. Proper repair and maintenance can keep the sand maker in good performance state. And can be carried out reliably at any time, so as to increase productivity and reduce production input.